Ala Wai Small Boat Harbor Improvements

Oceanit prepared the construction plans, specifications and secured permits for the following improvements at Ala Wai Small Boat Harbor: 1) replacement of the existing potable water main, including lateral connections, valves, and meters; and 2) replacement of existing finger piers with aluminum floating piers, including ADA-accessible cross docks, at the 500 Row Docks of Ala Wai Small Boat Harbor (AWSBH). Related improvements include gangways, security gates, and utilities.
Oceanit prepared and executed the construction plans, specifications and secured permits for needed improvements at Ala Wai Small Boat Harbor.

Oceanit handled the replacement of the existing potable water main, including lateral connections, valves, and meters; and the replacement of existing finger piers with aluminum floating piers, including ADA-accessible cross docks, at the 500 Row Docks of Ala Wai Small Boat Harbor (AWSBH). Related improvements include gangways, security gates, and utilities.

Oceanit prepared a topographic survey (including the location of utilities), a hydrographic survey, a geotechnical investigation, conceptual designs and alternatives, public informational meetings, construction plans and specifications, an engineering cost estimate, and all required permits prior to construction.

12
ala wai harbor